Boeing ZA006 (registered as N787ZA) is the sixth Dreamliner off the production line. It's taking off to the north from Boeing Field for ongoing flight testing of the plane mated to its GEnx-1B engines.
As of today, this airframe has undergone 84 flights totaling 266h 30m of flight time. Most of the testing has been with the competing Rolls-Royce Trent 1000 engines that are fitted to five of the seven Dreamliners in the test fleet.
0 comments:
Post a Comment