Pontoon T of the new SR520 floating bridge heads back out of Lake Washington through the Ballard Locks to get repaired at a drydock in Portland. Flaws in both the manufacture and design of four pontoons need to be repaired prior to the bridge being assembled.
No comments:
Post a Comment